ELTRA CS-800
The balance should also be placed free of vibration. The balance can be placed in any position, although positioning it to the right of the analyser has proved to be best suited.APPLICATIONS
3 MAINTENANCE 3.1 General information 3.2 Installing and removing the reagent tubes 3.3 Filling the reagent tubes 3.4 Replacing the O-rings 3.5 Replacing the furnace cleaning brush 3.6 Cleaning the dust trap 3.7 Replacing the combustion tube 3.8 Replacing the generator tube 3.9 Changing the combustion coil 3.10 Removing the pedestal 3.11 Checking for gas leaks 4DESCRIPTION
OF FUNCTIONS 4.1 Measuring principle 4.2 Gas flow system 4.3 Infrared cell 4.4 Furnace 5 MISCELLANEOUS 5.1 Ordering numbers 5.2 Packing 5.3 CS-800 pre-installation guide Copyright © 2004 by ELTRA GmbH Germany – November 2004 – Operation Manual CS-800 0 Free Datasheet 1 INSTALLATION 1.1 Setting up Since the analyser weighs about 85 kg it should be placed on a suitably stable surface. The balance can of course also be placed on a weighing table next to the analyser. There are no special requirements for setting up the printer and computer; they can be placed on a normal desk. Below is an example of installation: CS 8 00 C arb on S ul p hur D ete rmi n ator 15 10 5 1 1.