GOT1000 - Operator Terminals

📥 Download Datasheet

Full PDF Text Transcription

Click to expand full text
MITSUBISHI ELECTRIC GOT1000 Series Operator Terminals Dimensions 10 9.5 139 86 10 15.5 Installation and Wiring b Switch OFF the power supply of the operator terminal before starting the installation work or wiring and before mounting or removing the memory board. b When the communication between the operation terminal and the PLC fails it is impossible to operate keys or devices via the operation terminal. Therefore emergency stops and other safety functions must not be controlled via the PLC. Power Supply Wiring P DANGER Thread: #4-40UNC b Do not lay signal cables close to the main circuit, high-voltage power lines, or load lines. Otherwise effects of noise or surge induction are likely to take place. Keep a safe distance of more than 100 mm from the above when wiring.
Published: |